A B C D E F G H I J K L M N O P Q R S T U V W X Y Z

About On-line Help

AC Review Data

Activity Category

All Narrative

Area Office

Authorities Report

Authority File -- Editing

To ORPS Index


Before Operation

Bookmark

Boolean logic Specification Edit Box

Boolean Operators

Browser

Browser Help

To ORPS Index


CA Actual Completion Date

CA Date Justification

CA Revision Count

CA Status Report

CA Target Completion Date

Categorization Date/Time

Causal Factor Categories

Cause Description

Check Boxes

Chronology Dates - Specifying

Chronology Selection Box

Client

Codes/Stds Impact

Command Buttons

Computer-Based Training Module

Contamination / Radiation Control (Group 6 Reporting Criteria after ORPS redesign)

Contractor

Contributing Cause

Copy

Corrective Actions

Create Your Own Graphics

Cross-Category Items (Reporting Criteria prior to ORPS redesign)

Current Report Date/Time

Cut

To ORPS Index


Data Entry System

Date/Time Search Range on the ORPS OR Search & Reports page

Direct Access Installation

Direct Cause

Discovery Date/Time

Distribution Report

Division or Project

DOE Oral Notification Date

DOE Bulletins and Orders

Download

To ORPS Index


Edit Box

Edit Search Profile

Environmental (Reporting Criteria prior to ORPS redesign)

Environmental (Group 5 Reporting Criteria after ORPS redesign)

ES&H Impact

Excluding (Exclusions)

To ORPS Index


Facility

Facility Condition (Reporting Criteria prior to ORPS redesign)

Facility Function

Facility Manager (FM)

Facility Manager (FM) Evaluation

Facility Manager (FM) Sign-off Date

Facility Manager Functions

Facility Manager Reports

Facility Report

Facility Representative (FR) Input

Facility Representative (FR) Sign-off Date

Facility Representative Functions

Facility Representative Reports

Facility Status (Reporting Criteria prior to ORPS redesign)

Facility Status (Group 4 Reporting Criteria after ORPS redesign)

FAQs

Final Report Date/Time

Further Evaluation

Further Evaluation Date

To ORPS Index


Generic Lag Report

Graphics Report

To ORPS Index


Home Page

HTML

HTTP

Hyperlink

Hypermedia

Hypertext

To ORPS Index


Identification Selection Box

Immediate Actions

Initial Update Report Date/Time

Internet

To ORPS Index


Lab/Site/Org

Last Modification Date

Last Update Report Date/Time

Lessons Learned

Local

To ORPS Index


Management Concerns/Issues (Group 10 Reporting Criteria after ORPS Redesign)

Menu Bar

To ORPS Index


Narrative Selection Box

Nature of Occurrence (Reporting Criteria prior to ORPS redesign)

New Search Profile

Noncompliance Notifications (Reporting Criteria after ORPS Redesign)

Notification Report Date/Time

Nuclear Explosive Safety (Reporting Criteria prior to ORPS redesign)

Nuclear Explosive Safety (Reporting Criteria after ORPS redesign)

Nucliear Safety Basis (Group 3 Reporting Criteria after ORPS redesign)

Number of Occurrences

To ORPS Index


Occurrence Category (Prior to ORPS redesign)

Occurrence Description

Occurrence Report No.

Operating Conditions

Operating Experience Report

Operational Emergencies (Group 1 Reporting Criteria after ORPS redesign)

Operations/Field Office

OR Download Report

OR List Report

OR Subject Report

OR Status Report

OR Summary Report

Organization Changes

Organizational Hierarchy

Originator

ORPS Authority Search & Reports

ORPS Bulletins

ORPS GUI System Requirements

ORPS GUI Reference Manual

ORPS History Report

ORPS Search Criteria

ORPS Search and Reports

ORPS Screen OR Search Criteria

Other Notification Date/Time

To ORPS Index


Page

Paste

Personnel Radiation Protection (Reporting Criteria prior to ORPS redesign)

Personnel Safety (Reporting Criteria Prior to ORPS Redesign)

Personnel Safety and Health (Group 2 Reporting Criteria After ORPS Redesign)

Plant Area

Print

Problems and Troubleshooting

Program Manager (PM) Input

Program Manager (PM) Sign-off Date

Program Manager Functions

Program Manager Report

Programmatic Impact

Purpose and Use of ORPS

To ORPS Index


Radio Buttons

Refine Search Profile

Reject Count

Rejected Date

Remote

Report Type

Report Year

Reporting Criteria -- Note: These are the reporting criteria which should be used after the ORPS Redesign. By Group: Group 1-Operational Emergencies, Group 2-Personnel Safety and Health, Group 3-Nuclear Safety Basis, Group 4-Facility Status, Group 5-Environmental, Group 6-Contamination / Radiation Control, Group 7-Nuclear Explosive Safety, Group 8-Transportation, Group 9-Noncompliance Notifications, Group10-Management Concerns/Issues.

Reports

Root Cause

To ORPS Index


Safeguards/Security (Reporting Criteria prior to ORPS Redesign)

Save As

Search Profile

Searching Text Fields

Secretarial Office

Select

Selection Boxes

Sequence Number

Server

Similar Occurrences

Spell Checking

Status Line

Subject Report

Subject/Title

Summary Report

System, Building or Equipment

System Requirements

To ORPS Index


Text Operators and Modifiers

Tool Bar Buttons

Training Database

Transportation (Reporting Criteria prior to ORPS redesign)

To ORPS Index


URL

User Defined Fields

User-Defined Reports

To ORPS Index


Value Basis Reporting (Reporting Criteria Prior to ORPS Redesign)

Viewer

To ORPS Index


World Wide Web

To ORPS Index

ORPS Help Table of Contents